0442-920100 info@wasaokara.gop.pk

New Connection Form

New Connection Application

Download the application form for new water supply and sewerage connections from WASA Okara. Please ensure you complete all required fields and submit the form along with the necessary documents to our customer service center.

Water Supply Connection

Water Connection Application Form

PDF Format, 2 Pages, 1.2 MB

This form is required for applying for a new water supply connection to your property. The form includes sections for:

  • Applicant's personal information
  • Property details
  • Type of connection required
  • Payment information
  • Terms and conditions

Sewerage Connection

Sewerage Connection Application Form

PDF Format, 2 Pages, 1.3 MB

This form is required for applying for a new sewerage connection to your property. The form includes sections for:

  • Applicant's personal information
  • Property details
  • Type of connection required
  • Payment information
  • Terms and conditions

Apply Online

Submit Your Application Online

For your convenience, you can now apply for a new connection online without downloading forms. Our online application system provides:

  • 24/7 application submission
  • Instant application tracking
  • Secure document upload
  • Online payment options
  • Email notifications at each step
Start Online Application
Online Application

Application Process

Steps to Apply for a New Connection

  1. Download and Fill the Form

    Download the appropriate form (water supply or sewerage) and fill in all required information accurately.

  2. Gather Required Documents

    Collect all necessary supporting documents as mentioned in the checklist below.

  3. Pay Application Fee

    Pay the application processing fee at any designated bank or online through our payment portal.

  4. Submit Application

    Submit the completed form along with supporting documents and payment receipt to our customer service center.

  5. Site Inspection

    Our technical team will conduct a site inspection to assess feasibility and connection requirements.

  6. Approval and Payment

    Upon approval, you will receive a demand notice for connection charges. Make the payment within the specified time.

  7. Connection Installation

    After payment confirmation, our team will schedule and complete the connection installation.

Required Documents Checklist

Document Residential Commercial
Completed Application Form
Copy of CNIC
Property Ownership Proof
Site Plan/Map
Building Approval Plan
Previous Utility Bills (if any)
Business Registration Certificate
NOC from Environmental Department
Application Fee Receipt
Passport Size Photographs 2 2
Connection Charges

Connection charges vary based on:

  • Type of connection (water supply/sewerage)
  • Property type (residential/commercial/industrial)
  • Property size
  • Connection diameter
  • Distance from main line

For detailed fee structure, please contact our customer service or visit our office.

Frequently Asked Questions

The standard processing time for a new connection application is 15-20 working days from the date of submission of a complete application with all required documents. This includes:

  • Application review: 3-5 days
  • Site inspection: 5-7 days
  • Approval and demand notice generation: 2-3 days
  • Connection installation after payment: 5-7 days

Processing times may vary based on the complexity of the connection and current workload.

Yes, you can apply for both water supply and sewerage connections simultaneously. In fact, we recommend this approach as it streamlines the process and may reduce overall costs. You will need to:

  • Fill out both application forms
  • Submit a single set of supporting documents (no need to duplicate)
  • Pay the application fees for both services

Our team will coordinate the site inspection and installation for both services to minimize disruption.

If WASA main lines (water supply or sewerage) are not available in close proximity to your property, the following options are available:

  1. Extension of Main Line: You can apply for an extension of the main line to your area. This involves additional costs and requires approval based on technical feasibility.
  2. Community Application: You can coordinate with neighbors to submit a collective application for main line extension, which may reduce per-household costs.
  3. Development Scheme: Your area may be included in upcoming development schemes. You can check with our Planning Department for information on future expansion plans.

Each case is evaluated individually based on distance, technical feasibility, and cost considerations.

No, all connection work from WASA main lines to the property boundary must be carried out by WASA authorized personnel only. This ensures:

  • Compliance with technical specifications and standards
  • Proper documentation and mapping of connection points
  • Prevention of damage to existing infrastructure
  • Quality assurance and warranty for the connection work

However, internal plumbing work within your property boundary can be done by private contractors of your choice, provided they follow the building codes and standards.

WASA Okara offers several payment options for connection charges:

  • Bank Deposit: Direct deposit at designated bank branches
  • Online Banking: Transfer through internet banking
  • Mobile Banking: Payment through mobile banking apps
  • Cash Payment: At WASA Okara customer service centers
  • Installment Plan: For connections with high charges (subject to approval)

The demand notice issued after application approval will contain detailed payment instructions and options.

Need Assistance?

If you have any questions about the application process or need help filling out the form, our customer service team is here to assist you.

Call Us

042-111-WASA-J (111-927-25)

Email Us

info@wasaokara.gov.pk